English (UK)
Separation Layer Measurement in Primary Clarifier
Wastewater Treatment Plant - Preclarification

Application
- Rectangular basin 30 m x 8.5 m with two outlet funnels
- Basin depth 2.8 m
- Funnel depth 5.8 m
Definition of tasks
- Sludge discharge control depending on the sludge level
- Continuous detection of both sludge levels and analog transmission to the control system
- Cost-efficient measurement system
Advantages
-
Maintaining a defined sludge level increases the dry substance concentration and hence increases the efficiency of the digestion tower