Hot Sludge Flow Measurement
Continuous measurement of sludge coming from a digestion tower and being pumped through a heat exchanger. Required to detect possible blockage or reduced pump performance and to ensure permanent heat supply for the WWTP social areas.
Partial Discharge Section Flow Measurement
Exact and maintenance-free flow measurement in full filled stainless steel pipe DN 500.
Return Sludge Flow Measurement
Flow Mesaurement and flow volume in telescopic pipes.
Flow Measurement Using Inverted ''Goose Neck'' Syphon
Accurate measurement with high operational reliability required, which currently cannot be guaranteed due to the installed EMF, air within the pipeline and a much too short calming section.
Separation Layer Measurement in Primary Clarifier
Continuous 2-channel-separation layer in Primary Clarifier.
Volume Measurement Overhead Tank
Non-contact flow measurement in a pipe made of cast iron serving for discharge measurement to the overhead tank.
Flow Measurement at Overflow Sil
Detection of overflow volume, overflow time and duration at an overflow sil of a WWTP
Independent Level Measurement
Measurement and transmission of groundwater level measurement without any power supply.
Open Channel Flow Measurement
Common Level and Flow velocity measurement with a sensor in a partly filled inflow channel.